Hiring of Consultants - Milestone/Deliverable Based - Environmental Impact Assessment (EIA) study for Korba Super Thermal Power Project Stage-IV (2x800MW); Forest and Environment; Yes; Hybrid(As speci
This tender has closed. It is published here as a public record.
- Buyer: NA
- Ministry: Ministry of Power
- Category: Hiring of Consultants - Milestone/Deliverable Based - Environmental Impact Assessment (EIA) study for Korba Super Thermal Power Project Stage-IV (2x800MW); Forest and Environment; Yes; Hybrid(As specified in scope of work)
- Delivery location: Cc-eoc Noida
- Bid type: bid
- Published on: 06 Aug 2026
- Closed on: 19 Aug 2026, 06:00 pm IST
Who can bid, EMD and how to apply
- Who can bid: any seller registered on the Government e-Marketplace for Hiring of Consultants - Milestone/Deliverable Based - Environmental Impact Assessment (EIA) study for Korba Super Thermal Power Project Stage-IV (2x800MW); Forest and Environment; Yes; Hybrid(As specified in scope of work).
- EMD: as declared on GeM.
- Last date: closed on 19 Aug 2026, 06:00 pm IST.
- Where to apply: on GeM (bidplus.gem.gov.in). The bid number, documents and buyer details open with a free iBid.Win account.
Similar live tenders
- Hiring of Consultants - Milestone/Deliverable Based - EIA/EMP STUDY OF HIRONG ,PREPARATION OF ENVIRONMENT&ECOLOGY CHAPTER OF DPR; Forest and Environment, As per bid document; No; Hybrid(As specified in scope of work) — Hydro Power (Same GeM category; Items alike: eia, environment; Same ministry)
- Hiring of Consultants - Milestone/Deliverable Based - As per NIT; CSR Impact Assessment; Yes; Hybrid(As specified in scope of work) — Housing Urban Development Corporation Ltd (Same GeM category; Items alike: impact assessment, assessment, impact)
- Hiring of Consultants - Milestone/Deliverable Based - Management Consultants, Appointment of Consultant for the work of Feasibility study for set up 800 MW and above capacity Coal based Supercritical Ultra Supercritical Thermal Power Project at exist..,Hiring of Consultants - Milestone/Deliverable Based - Management Consultants, Appointment of Consultant for the work of Preparation of Detail Project Report DPR for set up 800 MW and above capacity Coal based Supercritical Ultra Supercritical Thermal.. — Energy and Petro Chemicals Department Gujarat, Gujarat (Same GeM category; Items alike: power project, thermal power, study)
- Hiring of Consultants - Milestone/Deliverable Based - Subject Matter Experts, Rupees 354400000 inclusive of GST; Project Management, DPR,RFP Preparation & Bid Process Management, Engineering Design, Energy (Oil, Gas, Power, Renewables); No; Hybrid(As.. — Hydro Power (Same GeM category; Same ministry)
- Hiring of Consultants - Milestone/Deliverable Based - Safety Audit Service; Safety Audit; Yes; Onsite — NORTH EASTERN ELECTRIC POWER Corporation Limited (Same GeM category; Same ministry)
Did you know? More tenders from Ntpc Limited · Cc-eoc Noida
Same buying office · 14 open tenders
- Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System — NA
- Supply of Rectangular FRP Planter with removable FRP tray,Filling of planter of size 30x14x14 inch,Supply, transport, placement, alignment and plantation of approved plants, including installation, watering, cleaning, labour, tools and incidental works.,Supply of Round FRP PLANTER,Filling of planter of size 3 feet x 3 feet,Supply transport placement alignment and planting of Terminalia trees in 3 ft x 3 ft planters as per approved landscape theme including watering cleaning labour tools and equipment — NA
- High End Engineering Laptops — NA
- Operation and Maintenance Of Electrical Systems/Electrical Installations - Complete System — NA
- Cyber Security Audit - As per bid documents — NA
- M8110990162- CBL, PWR: 240MM2, 1C, AL, 11KV(UE) , ARM, XLPE — NA
Browse live GeM tenders · Guides for bidders · More from Ministry of Power · More Hiring of Consultants - Milestone/Deliverable Based - Environmental Impact Assessment (EIA) study for Korba Super Thermal Power Project Stage-IV (2x800MW); Forest and Environment; Yes; Hybrid(As specified in scope of work) tenders