Installation/ Erection and commissioning of Plante Type Lead Acid Storage Battery Bank 1285 Ah
This tender has closed. It is published here as a public record.
- Buyer: Materials Management
- Ministry: Ministry of Coal
- Category: Installation/ Erection and commissioning of Plante Type Lead Acid Storage Battery Bank 1285 Ah
- Location: Neyveli, Tamil Nadu
- Delivery location: Materials Management
- EMD: ₹2,00,000
- Bid type: bid
- Published on: 27 May 2026
- Closed on: 08 Aug 2026, 03:00 pm IST
About this tender
Installation/ Erection and commissioning of Plante Type Lead — total quantity 3. EMD ₹2,00,000; ePBG 5% for 28 months. Delivery to 1 consignee location, 180 days delivery. EMD exemption route; ±25% option clause on quantity.
Who can bid, EMD and how to apply
- Who can bid: any seller registered on the Government e-Marketplace for Installation/ Erection and commissioning of Plante Type Lead Acid Storage Battery Bank 1285 Ah.
- EMD: ₹2,00,000.
- Last date: closed on 08 Aug 2026, 03:00 pm IST.
- Where to apply: on GeM (bidplus.gem.gov.in). The bid number, documents and buyer details open with a free iBid.Win account.
Similar live tenders
- Lead Acid Storage Batteries For Motor Vehicles with Light Weight and High Cranking Performance (V2) Conforming to IS 14257 — AI Airport Services Limited, Tamil Nadu (Items alike: acid storage, lead acid, lead; Same state)
- NI CD BATTERY BANK,Installation and Commissioning — Department of Fertilizers, Madhya Pradesh (Items alike: battery bank, bank)
- Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549,Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 — NA, Tamil Nadu (Items alike: lead acid, lead; Same state)
- BATTERY LEAD ACID 12V, 180AH — Department of Defence, Tamil Nadu (Items alike: lead acid, lead; Same state)
- Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 — Indian Railways, Tamil Nadu (Items alike: lead acid, lead; Same state)
Did you know? More tenders from Nlc India Limited · Materials Management
Same buying office · 93 open tenders
- SM460020011_ CAM WHEEL BUSH HOUSING FOR MAN SPR/1420-22/ TRACK Draw No. SME 0759 REV-A,SM460020011_ CAM WHEEL BUSH HOUSING FOR MAN SPR/1420-22/ TRACK Draw No. SME 0759 REV-A,SM460020043 - SPILIT BUSH HOUSING FOR CAM WHEEL SHAFT/1193/1145BWE/TRACK GEAR BOX END,SM460020043 - SPILIT BUSH HOUSING FOR CAM WHEEL SHAFT/1193/1145BWE/TRACK GEAR BOX END — Materials Management
- ST010540012: Lance Tube of Seal Pot Spiess Valve — Materials Management
- SITC of drag link type dust collector and wiper at the tail end of 2000mm conveyor,SITC of drag link type dust collector and wiper at the tail end of 2400mm conveyor — Materials Management
- PROXIMITY SWITCHES 250mAMPS. MAKE: IFM ELECTRONICS GERMANY. TYPE: IB — Materials Management
- 100Watts cool white LED FLOOD LIGHT 110V, 50Hz single phase AC — Materials Management
- " MATERIAL GATE PASS BOOK: MADE UP OF 54 GSM, WHITE CREAM WOVE PAPERON TOP, WITH 3 COPIES, COLOUR S,OUT PASS BOOK (Employee) : MADE UP OF YELLOW COLOUR PRINTING PAPER OF 45GSM, 100 SHE ETS PER BOOK, BO,Stores Requisition Book (Single Item) : Made up of 50 to 54 GSM white cream wove paper on top with 3 c,Attendance Register: 24 Sheets of size 33.7 cm x 20.7 cm on both sidewith single colour (black) prin — Materials Management
Browse live GeM tenders · Guides for bidders · More from Ministry of Coal · More in Tamil Nadu · More Installation/ Erection and commissioning of Plante Type Lead Acid Storage Battery Bank 1285 Ah tenders