SUPPLY INSTALLATION AND COMMISSIONING OF PLANTE TYPE 2250AH BATTERY BANKS INCLUDING BUY BACK FOR UPS
This tender has closed. It is published here as a public record.
- Buyer: Department of Atomic Energy
- Ministry: PMO
- Category: SUPPLY INSTALLATION AND COMMISSIONING OF PLANTE TYPE 2250AH BATTERY BANKS INCLUDING BUY BACK FOR UPS
- Location: Chengalpattu, Tamil Nadu
- Delivery location: Kalpakkam
- EMD: ₹12,34,404
- Bid type: bid
- Published on: 30 Jul 2026
- Closed on: 28 Aug 2026, 11:00 am IST
About this tender
SUPPLY INSTALLATION AND COMMISSIONING OF PLANTE — total quantity 2. EMD ₹12,34,404; ePBG 5% for 28 months. Delivery to 1 consignee location, 365 days delivery. EMD exemption route; ±25% option clause on quantity.
Who can bid, EMD and how to apply
- Who can bid: any seller registered on the Government e-Marketplace for SUPPLY INSTALLATION AND COMMISSIONING OF PLANTE TYPE 2250AH BATTERY BANKS INCLUDING BUY BACK FOR UPS.
- EMD: ₹12,34,404.
- Last date: closed on 28 Aug 2026, 11:00 am IST.
- Where to apply: on GeM (bidplus.gem.gov.in). The bid number, documents and buyer details open with a free iBid.Win account.
Similar live tenders
- Supply and Installation of I5 Desktop Computer with Buy Back — Department of Higher Education, West Bengal (Items alike: buy back, buy, back)
- HOUSEKEEPING MACHINE WITH BUY BACK — NA, Kerala (Items alike: buy back, buy, back)
- Online UPS Battery with Buy Back — Ministry of Micro Small and Medium Enterprises, Assam (Items alike: buy back, buy, back)
- Supply, Transportation, Installation, Testing & Commissioning of 220V DC Battery bank — NA, Jammu and Kashmir (Items alike: battery bank, bank)
- NI CD BATTERY BANK,Installation and Commissioning — Department of Fertilizers, Madhya Pradesh (Items alike: battery bank, bank)
Did you know? More tenders from Nuclear Power Corporation Of India Limited · Kalpakkam
Same GeM buyer account · 8 open tenders
- ITEM NO.35 Fenner make pulley with bush of Series 4A SPA of PCD 190 mm,ITEM NO.36 Fenner make pulley with bush of Series 4A SPA of PCD 180 mm,ITEM NO.37 Fenner make pulley with bush of Series 1B SPB of PCD 125 mm,ITEM NO.38 Fenner make pulley with bush of Series 1B SPB of PCD 140 mm,ITEM NO.39 Fenner make pulley with bush of Series 1B SPB of PCD 250 mm,ITEM NO.40 Fenner make pulley with bush of Series 2B SPB of PCD 118 mm,ITEM NO.41 Fenner make pulley with bush of Series 2B SPB of PCD 132 mm,ITEM NO.42 Fenner make pulley with bush of Series 2B SPB of PCD 150 mm,ITEM NO.43 Fenner make pulley with bush of Series 2B SPB of PCD 170 mm,ITEM NO.44 Fenner make pulley with bush of Series 2B SPB of PCD 190 mm,ITEM NO.45 Fenner make pulley with bush of Series 2B SPB of PCD 212 mm,ITEM NO.46 Fenner make pulley with bush of Series 2B SPB of PCD 224 mm,ITEM NO.47 Fenner make pulley with bush of Series 2B SPB of PCD 250 mm,ITEM NO.48 Fenner make pulley with bush of Series 2B SPB of PCD 280 mm,ITEM NO.49 Fenner make pulley — Department of Atomic Energy
- Aluminium Brass Tube as per ASTM B-111 Alloy 687 — Department of Atomic Energy
- Spent fuel storage bay floor cleaning system- Specification as per annexure enclosed. — Department of Atomic Energy
- NEEDLE VALVE END CONN 1 BY 4 INCH,NEEDLE VALVE END CONN 3 BY 8 INCH,NEEDLE VALVE END CONN 1 BY 2 INCH,BALL VALVE END CONN 1 BY 2 INCH,NEEDLE VALVE END CONN 3 BY 8 INCH,NEEDLE VALVE END CONN 1 BY 2 INCH,NEEDLE VALVE END CONN 1 BY 4 INCH,NEEDLE VALVE END CONN 1 BY 2 INCH,BALL VALVE END CONN 3 BY 8 INCH,BALL VALVE END CONN 1 BY 4 INCH,DIAPHRAGM VALVE END CONN 3 BY 8 INCH,CHECK VALVE END CONN 3 BY 8 INCH,BALL VALVE END CONN 3 BY 8 INCH — Department of Atomic Energy
- WATER FIRE TENDER 14KL CAPACITY — Department of Atomic Energy
- PROCESS WATER MONITOR- BLOW DOWN ACTIVITY MONITOR AS PER ATTACHMENT — Department of Atomic Energy
Browse live GeM tenders · Guides for bidders · More from PMO · More in Tamil Nadu · More SUPPLY INSTALLATION AND COMMISSIONING OF PLANTE TYPE 2250AH BATTERY BANKS INCLUDING BUY BACK FOR UPS tenders